Knockdown Rebuild Cost Planning Worksheet

A blank, stage-by-stage worksheet for recording your own current quotes, actuals, allowances, exclusions, and source notes. It does not provide market rates or a project estimate.

8 min readPrintable worksheetUpdated July 2026

What is inside

  • Common cost categories to investigate and adapt
  • Blank columns for estimate, written quote, and actual cost
  • Questions about scope, source, exclusions, and responsibility
  • A place to record project-specific contingency advice
  • No purported live, local, average, or fair-price benchmarks

How to use it

  1. Remove categories that do not apply and add the ones your documents require
  2. Record the source, date, scope, tax treatment, assumptions, and exclusions for each amount
  3. Compare written proposals only after aligning quantities, specifications, responsibilities, timing, and terms
  4. Replace provisional allowances as investigations, designs, and quotes arrive
  5. Obtain quantity-surveying, tax, finance, legal, insurance, and construction advice where appropriate

Project Cost Summary

There is no reliable generic total or per-square-metre rate for your project. Build this summary from the documents, investigations, measured scope, current written proposals, contracts, and professional advice you actually hold.

CategoryPlanning allowanceWritten quoteActualSource / scope note
Property, due diligence and finance$_______$_______$_______Confirm acquisition, lending, tax, holding, and advice costs
Design, consultants and investigations$_______$_______$_______List each appointed service, deliverable, revision, and exclusion
Applications, approvals and authority charges$_______$_______$_______Confirm current pathway, fee basis, levies, bonds, and conditions
Insurance and statutory schemes$_______$_______$_______Use current written advice and policy documents
Demolition and site preparation$_______$_______$_______Align hazardous materials, services, access, waste, monitoring, clearance, and handover
Earthworks, foundations and structure$_______$_______$_______Use issued design, measured quantities, access, testing, inspections, and temporary works
External envelope$_______$_______$_______Coordinate roof, walls, windows, doors, drainage, weatherproofing, access, and certification
Services$_______$_______$_______Coordinate electrical, hydraulic, mechanical, communications, energy, utilities, testing, and certification
Internal linings, finishes and fixtures$_______$_______$_______Record specifications, quantities, substrates, preparation, supply, installation, and protection
External works and landscaping$_______$_______$_______Include approvals, drainage, driveways, paths, retaining, fencing, planting, and interfaces
Temporary works and site running costs$_______$_______$_______Confirm facilities, fencing, power, water, waste, security, access, hire, and duration
Completion, defects and handover$_______$_______$_______Include testing, rectification, cleaning, certificates, records, service approvals, and close-out
Project-specific contingency$_______$_______$_______Record the basis and advice; do not copy a generic percentage
Keep in mind: Do not compare this total directly with a builder's proposal unless the scope, supervision, overhead, risk allocation, warranties, programme, exclusions, tax, and responsibilities have been aligned.

1. Demolition and Site Preparation

Existing conditions and authority processes can materially change scope. Confirm what must be investigated before requesting like-for-like written proposals.

Line itemAllowanceQuoteActualQuestion to resolve
Hazardous-material investigation$_______$_______$_______Who is qualified, what is sampled, and what report or register is issued?
Service disconnection or protection$_______$_______$_______What does each provider require, who applies, and what remains excluded?
Demolition and salvage$_______$_______$_______What structures, slabs, footings, vegetation, fixtures, and materials are included?
Removal, transport and lawful disposal$_______$_______$_______How are materials classified, tracked, recycled, disposed of, and evidenced?
Monitoring and clearance$_______$_______$_______Which inspections, air monitoring, validation, clearance, or certificates apply?
Site security, access and public protection$_______$_______$_______Who designs, supplies, maintains, alters, and removes each control?
Site handover condition$_______$_______$_______What levels, compaction, debris removal, survey, testing, and records are required?

2. Design, Approvals and Professional Services

Line itemAllowanceQuoteActualQuestion to resolve
Architecture or building design$_______$_______$_______What stages, drawings, schedules, coordination, revisions, and construction support are included?
Surveying$_______$_______$_______Which boundary, feature, level, set-out, identification, and as-built services apply?
Engineering$_______$_______$_______Which disciplines, designs, inspections, certifications, changes, and site attendance are included?
Geotechnical and other investigations$_______$_______$_______What fieldwork, testing, assumptions, reporting, and follow-up are included?
Energy and sustainability$_______$_______$_______Which assessment, report, certificate, commitments, testing, and evidence apply?
Planning and building approvals$_______$_______$_______Which authority, pathway, information, notification, assessment, amendment, and close-out steps apply?
Certifier or surveyor service$_______$_______$_______What statutory functions, inspections, notices, fees, exclusions, and record requirements apply?

3. Structure and External Envelope

Line itemAllowanceQuoteActualQuestion to resolve
Earthworks, retaining and drainage$_______$_______$_______Align design, quantities, classification, haulage, disposal, import, access, testing, and temporary works
Foundations and slab$_______$_______$_______Align issued design, quantities, reinforcement, services, pumping, curing, testing, inspections, and exclusions
Frame and structural steel$_______$_______$_______Align fabrication, treatment, delivery, craneage, erection, temporary stability, connections, changes, and evidence
Roof system$_______$_______$_______Align structure, cladding, underlay, insulation, drainage, flashings, penetrations, safety, access, and certification
External walls$_______$_______$_______Align complete compatible system, substrates, membranes, cavities, flashings, finishes, access, and interfaces
Windows and external doors$_______$_______$_______Align schedule, glazing, performance, hardware, reveals, delivery, installation, sealing, and certification

4. Services, Interiors and External Works

Line itemAllowanceQuoteActualQuestion to resolve
Electrical and communications$_______$_______$_______Record quantities, equipment, switchboard, supply, rough-in, fit-off, testing, certificates, and exclusions
Hydraulic, gas and drainage$_______$_______$_______Record fixtures, services, connections, equipment, rough-in, fit-off, testing, approvals, and exclusions
Heating, cooling and ventilation$_______$_______$_______Record design, capacity, efficiency, equipment, controls, penetrations, commissioning, and maintenance
Insulation, lining and waterproofing$_______$_______$_______Align approved systems, substrates, preparation, access, inspections, testing, certification, and protection
Joinery, finishes and fixtures$_______$_______$_______Use schedules and measured quantities; align samples, shop drawings, supply, installation, protection, and defects
Driveways, paths, fencing and landscaping$_______$_______$_______Align approvals, design, levels, drainage, services, access, finishes, establishment, and maintenance

Source and Assumption Register

For each amount, record who supplied it, when, the document or proposal version, whether tax is included, the exact scope, exclusions, validity period, assumptions, and confidence. A number without that context is not a reliable comparison.

DateCategorySource / versionAmountScope, exclusions and assumptions
__/__/________________________________$_______________________________________
__/__/________________________________$_______________________________________
__/__/________________________________$_______________________________________
__/__/________________________________$_______________________________________
__/__/________________________________$_______________________________________
From worksheet to working record

Keep the questions, numbers and follow-up with the project.

Bildr brings your plans, budget, trade proposals, programme and project records together. Important figures, dates, scopes and compliance-related changes still wait for your confirmation.

Use your own plans. Review Bildr’s first reading and answer five tailored questions free. No card.