Owner Builder Budget Template

A printable, fill-in-the-blanks budget tracker covering common categories in an Australian residential build. Adapt the worksheet to your project and track quotes, actuals, variations, and contingency.

5 min read8 printable pagesUpdated March 2026

What is inside

  • 15 common planning categories to adapt to your project
  • 90+ individual line items with space for quoted vs actual costs
  • Space to record project-specific contingency advice and allowances
  • Variation log to catch scope creep before it blows your budget
  • Summary section with total budget health at a glance

How to use it

  1. Print this page or save as PDF using the button above
  2. Fill in the 'Quoted' column as you receive trade quotes
  3. Update the 'Actual' column as invoices are paid
  4. Review the 'Variance' column weekly to catch overspend early
  5. Use the Variation Log at the bottom for any scope changes

Budget Summary

Fill in this summary section first as a high-level snapshot, then use the detailed trade tables below to track individual line items.

CategoryBudgetedQuotedActualVariance
Pre-construction$_______$_______$_______$_______
Site Preparation$_______$_______$_______$_______
Slab / Foundations$_______$_______$_______$_______
Framing$_______$_______$_______$_______
Roofing$_______$_______$_______$_______
Brickwork / Cladding$_______$_______$_______$_______
Windows & Doors$_______$_______$_______$_______
Plumbing$_______$_______$_______$_______
Electrical$_______$_______$_______$_______
Insulation & Plasterboard$_______$_______$_______$_______
Tiling & Waterproofing$_______$_______$_______$_______
Cabinetry & Joinery$_______$_______$_______$_______
Painting$_______$_______$_______$_______
Landscaping & External$_______$_______$_______$_______
Fixtures & Fittings$_______$_______$_______$_______
Project-specific contingency$_______$_______$_______$_______
TOTAL$_______$_______$_______$_______
Keep in mind: Investigate material variance in context. Check whether scope, quantity, specification, timing, exclusions, tax, or classification changed before drawing a conclusion from a percentage.

1. Pre-Construction

These costs may arise before site work begins. Confirm which professional, approval, investigation, insurance, and authority items apply to your project and replace blank allowances with current evidence.

Line ItemQuotedActualNotes
Council application / DA fees$_______$_______
Engineering (structural)$_______$_______
Architectural / drafting$_______$_______
Soil / geotech report$_______$_______
Surveyor (boundary + levels)$_______$_______
Energy / sustainability documentation$_______$_______
BASIX certificate (NSW only)$_______$_______
Owner-builder permit fees$_______$_______
Home warranty insurance$_______$_______
Project-specific contingency$_______$_______

2. Site Preparation

Site costs vary wildly based on access, slope, soil type, and whether you're demolishing an existing structure.

Line ItemQuotedActualNotes
Demolition (if KDR)$_______$_______
Asbestos removal$_______$_______
Tree removal / clearing$_______$_______
Temporary fencing$_______$_______
Portaloo hire$_______$_______
Skip bin / waste removal$_______$_______
Site cut / earthworks$_______$_______
Retaining walls (if sloped)$_______$_______
Temporary power connection$_______$_______
Project-specific contingency$_______$_______

3. Slab & Foundations

Line ItemQuotedActualNotes
Concrete slab (waffle/raft)$_______$_______
Reinforcement (reo mesh / bar)$_______$_______
Plumbing rough-in (under slab)$_______$_______
Termite treatment / barrier$_______$_______
Waterproof membrane$_______$_______
Pump / crane hire (if needed)$_______$_______
Project-specific contingency$_______$_______
Keep in mind: Coordinate and verify under-slab services against the approved design before concrete placement. Later changes can require destructive work, approvals, redesign, delay, and additional cost.

4. Framing

Framing can be a material package. Obtain enough comparable written proposals for a considered decision and align the scope, including trusses, bracing, tie-downs, access, craneage, supply, and installation responsibilities.

Line ItemQuotedActualNotes
Wall frames (supply + install)$_______$_______
Roof trusses (supply + install)$_______$_______
Structural steel (lintels, posts)$_______$_______
Bracing / tie-downs$_______$_______
Scaffolding hire$_______$_______
Crane hire (truss lift)$_______$_______
Project-specific contingency$_______$_______

5. Roofing

Line ItemQuotedActualNotes
Roof sheeting (Colorbond/tiles)$_______$_______
Fascia & guttering$_______$_______
Downpipes$_______$_______
Roof sarking / underlay$_______$_______
Ridge capping$_______$_______
Skylights (if any)$_______$_______
Project-specific contingency$_______$_______

6. Brickwork & Cladding

Line ItemQuotedActualNotes
Bricks / blocks (supply)$_______$_______
Bricklayer (labour)$_______$_______
External cladding (if applicable)$_______$_______
Render / texture coat$_______$_______
Wall wrapping / sarking$_______$_______
Project-specific contingency$_______$_______

7. Windows & Doors

Line ItemQuotedActualNotes
Windows (supply)$_______$_______
Window installation$_______$_______
External doors (supply + install)$_______$_______
Internal doors (supply + install)$_______$_______
Sliding / bi-fold doors$_______$_______
Garage door$_______$_______
Door hardware$_______$_______
Project-specific contingency$_______$_______

8. Plumbing

Line ItemQuotedActualNotes
Plumbing rough-in (above slab)$_______$_______
Hot water system$_______$_______
Fit-off (taps, basins, toilets)$_______$_______
Gas fitting (if applicable)$_______$_______
Stormwater / drainage$_______$_______
Sewer connection$_______$_______
Project-specific contingency$_______$_______

9. Electrical

Line ItemQuotedActualNotes
Electrical rough-in$_______$_______
Switchboard upgrade / install$_______$_______
Fit-off (GPOs, lights, switches)$_______$_______
Data / ethernet cabling$_______$_______
Smoke alarm system$_______$_______
Solar panel pre-wire (if future)$_______$_______
Air conditioning pre-wire$_______$_______
Project-specific contingency$_______$_______

10. Insulation & Plasterboard

Line ItemQuotedActualNotes
Wall insulation (batts/foam)$_______$_______
Ceiling insulation$_______$_______
Plasterboard supply + install$_______$_______
Cornice installation$_______$_______
Plasterboard stopping / sanding$_______$_______
Project-specific contingency$_______$_______

11. Tiling & Waterproofing

Line ItemQuotedActualNotes
Waterproofing (wet areas)$_______$_______
Floor tiles (supply)$_______$_______
Wall tiles (supply)$_______$_______
Tiling labour$_______$_______
Tile adhesive / grout$_______$_______
Shower screens$_______$_______
Project-specific contingency$_______$_______

12. Cabinetry & Joinery

Line ItemQuotedActualNotes
Kitchen cabinetry$_______$_______
Benchtops (stone/laminate)$_______$_______
Bathroom vanity units$_______$_______
Laundry cabinetry$_______$_______
Built-in wardrobes$_______$_______
Linen cupboard shelving$_______$_______
Project-specific contingency$_______$_______

13. Painting

Line ItemQuotedActualNotes
Internal painting (walls + ceilings)$_______$_______
External painting / render touch-up$_______$_______
Feature walls / accent colours$_______$_______
Paint materials (if DIY)$_______$_______
Project-specific contingency$_______$_______

14. Landscaping & External

Line ItemQuotedActualNotes
Driveway (concrete / pavers)$_______$_______
Paths & steps$_______$_______
Fencing (new / repair)$_______$_______
Retaining walls (external)$_______$_______
Turf / seeding$_______$_______
Garden beds / planting$_______$_______
Outdoor entertaining area$_______$_______
Letterbox / clothesline$_______$_______
Project-specific contingency$_______$_______

15. Fixtures & Fittings

Line ItemQuotedActualNotes
Tapware (kitchen, bathroom, laundry)$_______$_______
Toilets$_______$_______
Basins / sinks$_______$_______
Bath (if applicable)$_______$_______
Towel rails / accessories$_______$_______
Light fittings$_______$_______
Powerpoints / switches$_______$_______
Mirrors$_______$_______
Kitchen appliances$_______$_______
Project-specific contingency$_______$_______

Variation Log

Record proposed and approved variations here. Multiple small changes can materially affect budget, scope, time, and responsibility.

DateTradeDescriptionQuotedApprovedImpact
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______
__/__/__________________________________________$_______Y / N+$_______

How to use the Variation Log

Record proposed changes before authorising work and follow the variation process in the contract and applicable law. Verbal changes can create cost, scope, authority, and evidence disputes; obtain written details and advice where appropriate.

From worksheet to working record

Keep the questions, numbers and follow-up with the project.

Bildr brings your plans, budget, trade proposals, programme and project records together. Important figures, dates, scopes and compliance-related changes still wait for your confirmation.

Use your own plans. Review Bildr’s first reading and answer five tailored questions free. No card.